Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Problem in building Interstate Highway 79 across Conneaut Marsh in western Pennsylvania, was to assure that heavy construction equipment could get in to do job; twin bridges on pile foundations would carry highway over swamp; some 110,000 cu yd of peat were dredged to make channel 9×150 ft and 2200 ft long; floating equipment was then brought in to drive 816 steel pipe piles that would support twin bridges across marsh. (30668)
Problem in building Interstate Highway 79 across Conneaut Marsh in western Pennsylvania, was to assure that heavy construction equipment could get in to do job; twin bridges on pile foundations would carry highway over swamp; some 110,000 cu yd of peat were dredged to make channel 9×150 ft and 2200 ft long; floating equipment was then brought in to drive 816 steel pipe piles that would support twin bridges across marsh. (30668)
Conquering Conneaut Marsh
Civ Eng (NY)
Goff, J.S. (Autor:in)
1969
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1901
Effect of Seiches at Conneaut Harbor
Engineering Index Backfile | 1959
|The Conneaut and Erie interurban system
Engineering Index Backfile | 1904
Conneaut Harbor, Ohio. 1966 Project Modification
NTIS | 1971
Improvement of navigation conditions, conneaut harbor Ohio
Engineering Index Backfile | 1963