Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
7,000 ft of tunnel + 10,000 ft of approaches
Features of Virginia's new bridge tunnel project to cross Hampton Roads, from Hampton to Willoughby Spit; use of prestressed concrete for piles and for beams that carry roadway; methods used at casting yard to mass produce prestressed members; details of tunnel construction, dredging, pile driving and other constructional activities.
7,000 ft of tunnel + 10,000 ft of approaches
Features of Virginia's new bridge tunnel project to cross Hampton Roads, from Hampton to Willoughby Spit; use of prestressed concrete for piles and for beams that carry roadway; methods used at casting yard to mass produce prestressed members; details of tunnel construction, dredging, pile driving and other constructional activities.
7,000 ft of tunnel + 10,000 ft of approaches
Eng News-Rec
Engineering News-Record ; 155
1955
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Outfall runs 7,000 Ft into pacific
Engineering Index Backfile | 1955
|New 7,000 barrel cement mill in Buffalo district
Engineering Index Backfile | 1928
Materials: $7,000; Labor: $9,000; Sludge Bulking Control: Priceless
British Library Conference Proceedings | 2004
|