Construction of new 310,000-kw steam power plant costing about £379,000; preliminary excavation to water level; retaining walls and raft; circulating water system; coaling jetty; dredging. (See also - n 8 (discussion) 67-94 and Oct p 533-40)
Construction of new 310,000-kw steam power plant costing about £379,000; preliminary excavation to water level; retaining walls and raft; circulating water system; coaling jetty; dredging. (See also - n 8 (discussion) 67-94 and Oct p 533-40)
Constructional work of Fulham power-station
Instn Civ Engrs -- J
Hay, J.F. (Autor:in)
1938
8 pages
Aufsatz (Zeitschrift)