A platform for research: civil engineering, architecture and urbanism
Construction of new 310,000-kw steam power plant costing about £379,000; preliminary excavation to water level; retaining walls and raft; circulating water system; coaling jetty; dredging. (See also - n 8 (discussion) 67-94 and Oct p 533-40)
Construction of new 310,000-kw steam power plant costing about £379,000; preliminary excavation to water level; retaining walls and raft; circulating water system; coaling jetty; dredging. (See also - n 8 (discussion) 67-94 and Oct p 533-40)
Constructional work of Fulham power-station
Instn Civ Engrs -- J
Hay, J.F. (author)
1938
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chimneys at Fulham power station
Engineering Index Backfile | 1936
Hammersmith & Fulham revisited
British Library Online Contents | 1996
|Online Contents | 1993
Hammersmith & Fulham plans for regeneration
British Library Online Contents | 2009
|Tema Archive | 1975
|