Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Contractor rushes fill operations to complete Boca dam this season
Progress report on construction of earth fill dam in California, 110 ft max height, 1650 ft length; construction equipment; spillway of 8000 sec ft capacity will control flood flows through two 19 by 16 ft radial gates; principal unit bids; labor problems.
Contractor rushes fill operations to complete Boca dam this season
Progress report on construction of earth fill dam in California, 110 ft max height, 1650 ft length; construction equipment; spillway of 8000 sec ft capacity will control flood flows through two 19 by 16 ft radial gates; principal unit bids; labor problems.
Contractor rushes fill operations to complete Boca dam this season
Western Construction News
1938
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Contractor rushes fill operations to complete Boca dam this season
Engineering Index Backfile | 1938
Berg River Dam rushes to completion
British Library Online Contents | 2008
Texas rushes its centennial construction
Engineering Index Backfile | 1936
PPVRS Rushes in a New Era for Hydrographic Surveying
British Library Online Contents | 2008
Port development: Vietnam rushes to cope with looming congestion
British Library Online Contents | 2007