A platform for research: civil engineering, architecture and urbanism
Contractor rushes fill operations to complete Boca dam this season
Progress report on construction of earth fill dam in California, 110 ft max height, 1650 ft length; construction equipment; spillway of 8000 sec ft capacity will control flood flows through two 19 by 16 ft radial gates; principal unit bids; labor problems.
Contractor rushes fill operations to complete Boca dam this season
Progress report on construction of earth fill dam in California, 110 ft max height, 1650 ft length; construction equipment; spillway of 8000 sec ft capacity will control flood flows through two 19 by 16 ft radial gates; principal unit bids; labor problems.
Contractor rushes fill operations to complete Boca dam this season
Western Construction News
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Contractor rushes fill operations to complete Boca dam this season
Engineering Index Backfile | 1938
Berg River Dam rushes to completion
British Library Online Contents | 2008
Texas rushes its centennial construction
Engineering Index Backfile | 1936
PPVRS Rushes in a New Era for Hydrographic Surveying
British Library Online Contents | 2008
Port development: Vietnam rushes to cope with looming congestion
British Library Online Contents | 2007