Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Machines and methods for canal construction, Colorado river aqueduct
Methods and machines used in excavation and concrete-lined 62.8-mi open canal required for Colorado River aqueduct; design and operation of huge machines for trimming subgrades and for placing concrete; unit prices in canal construction contracts; subgrade trimming and canal paving machines; concrete construction details.
Machines and methods for canal construction, Colorado river aqueduct
Methods and machines used in excavation and concrete-lined 62.8-mi open canal required for Colorado River aqueduct; design and operation of huge machines for trimming subgrades and for placing concrete; unit prices in canal construction contracts; subgrade trimming and canal paving machines; concrete construction details.
Machines and methods for canal construction, Colorado river aqueduct
Civ Eng (NY)
Chadwick, W.L. (Autor:in) / Archibald, G.E. (Autor:in)
1938
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Machines and methods for canal construction, Colorado river aqueduct
Engineering Index Backfile | 1938
|Colorado River aqueduct construction
Engineering Index Backfile | 1932
|Colorado river aqueduct construction
Engineering Index Backfile | 1933
Tunnel construction -- Colorado River aqueduct
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1941