A platform for research: civil engineering, architecture and urbanism
Machines and methods for canal construction, Colorado river aqueduct
Methods and machines used in excavation and concrete-lined 62.8-mi open canal required for Colorado River aqueduct; design and operation of huge machines for trimming subgrades and for placing concrete; unit prices in canal construction contracts; subgrade trimming and canal paving machines; concrete construction details.
Machines and methods for canal construction, Colorado river aqueduct
Methods and machines used in excavation and concrete-lined 62.8-mi open canal required for Colorado River aqueduct; design and operation of huge machines for trimming subgrades and for placing concrete; unit prices in canal construction contracts; subgrade trimming and canal paving machines; concrete construction details.
Machines and methods for canal construction, Colorado river aqueduct
Civ Eng (NY)
Chadwick, W.L. (author) / Archibald, G.E. (author)
1938
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Machines and methods for canal construction, Colorado river aqueduct
Engineering Index Backfile | 1938
|Colorado river aqueduct construction
Engineering Index Backfile | 1933
Colorado River aqueduct construction
Engineering Index Backfile | 1932
|Tunnel construction -- Colorado River aqueduct
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1941