Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The erection of two large steam turbines
An illustrated detailed account of the methods used for overcoming difficulties in handling and assembling the heavy parts, with the minimum expense of time and trouble, in erecting the large turbines of the Brooklyn Rapid Transit Co., at the Williamsburg power house, and the Gold Street power house of the Edison Ill. Co. (2000 w.) (No. 80414 C)
The erection of two large steam turbines
An illustrated detailed account of the methods used for overcoming difficulties in handling and assembling the heavy parts, with the minimum expense of time and trouble, in erecting the large turbines of the Brooklyn Rapid Transit Co., at the Williamsburg power house, and the Gold Street power house of the Edison Ill. Co. (2000 w.) (No. 80414 C)
The erection of two large steam turbines
Sib Jour Engng
Christie, A.G. (Autor:in)
1906
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of Hydraulic Turbines and Generators
ASCE | 2021
|Erection of hydraulic turbines and generators
Engineering Index Backfile | 1945
|Erection of hydraulic turbines and generators
Engineering Index Backfile | 1944
|Discussion of “Gisigeh on Erection of Turbines”
ASCE | 2021
|Engineering Index Backfile | 1965
|