Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erection of hydraulic turbines and generators
Construction procedure for assembling and erecting turbines and generators recommended is based principally on methods used by Tennessee Valley Authority; installations vary from low head, large diameter Kaplan type turbines at Pickwick Landing, Tenn, to relatively high head Francis type units at Hiwassee, NC; fundamental rules apply to all types of installations and give comparable results; steps in erection are presented in order in which they generally occur. (See also - n 3 Mar 1944 p 255-66, n 6 (discussion) June p 1000-2)
Erection of hydraulic turbines and generators
Construction procedure for assembling and erecting turbines and generators recommended is based principally on methods used by Tennessee Valley Authority; installations vary from low head, large diameter Kaplan type turbines at Pickwick Landing, Tenn, to relatively high head Francis type units at Hiwassee, NC; fundamental rules apply to all types of installations and give comparable results; steps in erection are presented in order in which they generally occur. (See also - n 3 Mar 1944 p 255-66, n 6 (discussion) June p 1000-2)
Erection of hydraulic turbines and generators
Am Soc Civ Engrs -- Proc
Komora, A.M. (Autor:in)
1944
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of Hydraulic Turbines and Generators
ASCE | 2021
|Erection of hydraulic turbines and generators
Engineering Index Backfile | 1945
|The erection of two large steam turbines
Engineering Index Backfile | 1906
|Discussion of “Gisigeh on Erection of Turbines”
ASCE | 2021
|Closure to “Komora on Erection of Turbines”
ASCE | 2021
|