Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods whereby tile liner plates were placed first, then concrete poured around them; liner plates were placed on circular form, after tile edges were buttered with synthetic rubber compound; reinforcing steel was placed and tied, and wood forms for pipe itself placed; concrete was then poured and vibrated, and after 24 hr inner form was collapsed and moved along.
Methods whereby tile liner plates were placed first, then concrete poured around them; liner plates were placed on circular form, after tile edges were buttered with synthetic rubber compound; reinforcing steel was placed and tied, and wood forms for pipe itself placed; concrete was then poured and vibrated, and after 24 hr inner form was collapsed and moved along.
Honolulu builds sewer inside out
Eng News-Rec
Wallace, G.C. (Autor:in)
Engineering News-Record ; 143
1949
Illustration
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Honolulu outfall and intercepting sewer
Engineering Index Backfile | 1928
|Concrete construction builds Buffalo's great sewer system
Engineering Index Backfile | 1938
|Danville builds corrugated pipe sewer 100 feet above Vermilion River
Engineering Index Backfile | 1943
|Sanitary sewer corrosion model for the city and county of Honolulu, Hawaii
British Library Conference Proceedings | 1995
|