A platform for research: civil engineering, architecture and urbanism
Methods whereby tile liner plates were placed first, then concrete poured around them; liner plates were placed on circular form, after tile edges were buttered with synthetic rubber compound; reinforcing steel was placed and tied, and wood forms for pipe itself placed; concrete was then poured and vibrated, and after 24 hr inner form was collapsed and moved along.
Methods whereby tile liner plates were placed first, then concrete poured around them; liner plates were placed on circular form, after tile edges were buttered with synthetic rubber compound; reinforcing steel was placed and tied, and wood forms for pipe itself placed; concrete was then poured and vibrated, and after 24 hr inner form was collapsed and moved along.
Honolulu builds sewer inside out
Eng News-Rec
Wallace, G.C. (author)
Engineering News-Record ; 143
1949
Illustration
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Honolulu outfall and intercepting sewer
Engineering Index Backfile | 1928
|Concrete construction builds Buffalo's great sewer system
Engineering Index Backfile | 1938
|Danville builds corrugated pipe sewer 100 feet above Vermilion River
Engineering Index Backfile | 1943
|Sanitary sewer corrosion model for the city and county of Honolulu, Hawaii
British Library Conference Proceedings | 1995
|