Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
How 31-yr old primary system at Burroughs Adding Machine Co, Detroit, was modernized to provide added capacity and utility standby service.
How 31-yr old primary system at Burroughs Adding Machine Co, Detroit, was modernized to provide added capacity and utility standby service.
Renovating obsolete primary system
Elec Construction Maintenance
Kieb, N.A. (Autor:in)
1949
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ceramic tile renovating coating system and ceramic tile renovating method
Europäisches Patentamt | 2024
|TIBKAT | 2022
|British Library Conference Proceedings | 1997
|