A platform for research: civil engineering, architecture and urbanism
How 31-yr old primary system at Burroughs Adding Machine Co, Detroit, was modernized to provide added capacity and utility standby service.
How 31-yr old primary system at Burroughs Adding Machine Co, Detroit, was modernized to provide added capacity and utility standby service.
Renovating obsolete primary system
Elec Construction Maintenance
Kieb, N.A. (author)
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ceramic tile renovating coating system and ceramic tile renovating method
European Patent Office | 2024
|TIBKAT | 2022
|British Library Conference Proceedings | 1997
|