Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Use of prestressed concrete for footbridges over Charleroi Canal in Brussels, Belgium
Gosselies bridge with span of 20.75 m between abutments consists of two prestressed reinforced concrete girders; modul of elasticity and stress analysis; Malheid bridge has 40.50-m span; measurements of formations caused by loading and plastic flow; tables, plan drawings, photographs. (Flemish abstract, Feb p 141, Apr p 340.) (See also - n 1 Feb 1948 p 127-40, 1 supp plate)
Use of prestressed concrete for footbridges over Charleroi Canal in Brussels, Belgium
Gosselies bridge with span of 20.75 m between abutments consists of two prestressed reinforced concrete girders; modul of elasticity and stress analysis; Malheid bridge has 40.50-m span; measurements of formations caused by loading and plastic flow; tables, plan drawings, photographs. (Flemish abstract, Feb p 141, Apr p 340.) (See also - n 1 Feb 1948 p 127-40, 1 supp plate)
Use of prestressed concrete for footbridges over Charleroi Canal in Brussels, Belgium
Note sur l'emploi du beton precontraint dans la reconstruction des passerelles
Santilman, H. (Autor:in)
1948
31 pages
1 Supp Plate
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Modernization of Brussels-Charleroi canal
Engineering Index Backfile | 1964
Prestressed Concrete Footbridges
TIBKAT | 1962
|Prestressed precast concrete footbridges
Engineering Index Backfile | 1953
|Prestressed precast concrete footbridges
Engineering Index Backfile | 1952
|Tring prestressed brick footbridges
British Library Conference Proceedings | 1996
|