A platform for research: civil engineering, architecture and urbanism
Use of prestressed concrete for footbridges over Charleroi Canal in Brussels, Belgium
Gosselies bridge with span of 20.75 m between abutments consists of two prestressed reinforced concrete girders; modul of elasticity and stress analysis; Malheid bridge has 40.50-m span; measurements of formations caused by loading and plastic flow; tables, plan drawings, photographs. (Flemish abstract, Feb p 141, Apr p 340.) (See also - n 1 Feb 1948 p 127-40, 1 supp plate)
Use of prestressed concrete for footbridges over Charleroi Canal in Brussels, Belgium
Gosselies bridge with span of 20.75 m between abutments consists of two prestressed reinforced concrete girders; modul of elasticity and stress analysis; Malheid bridge has 40.50-m span; measurements of formations caused by loading and plastic flow; tables, plan drawings, photographs. (Flemish abstract, Feb p 141, Apr p 340.) (See also - n 1 Feb 1948 p 127-40, 1 supp plate)
Use of prestressed concrete for footbridges over Charleroi Canal in Brussels, Belgium
Note sur l'emploi du beton precontraint dans la reconstruction des passerelles
Santilman, H. (author)
1948
31 pages
1 Supp Plate
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Modernization of Brussels-Charleroi canal
Engineering Index Backfile | 1964
Prestressed Concrete Footbridges
TIBKAT | 1962
|Prestressed precast concrete footbridges
Engineering Index Backfile | 1953
|Prestressed precast concrete footbridges
Engineering Index Backfile | 1952
|Tring prestressed brick footbridges
British Library Conference Proceedings | 1996
|