Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Chuting concrete 175 prime vertically with no regrets
Methods used in building concrete retaining wall 300 ft down cliff and steep hillside to bottom of tower at Sea Lion Caves on coast of Oregon; concrete was placed through wooden chute 125 ft long, to point 75 ft above top of tower and from there by 5 in .diam 16-gage steel pipe; baffles prevented segregation; results reported satisfactory.
Chuting concrete 175 prime vertically with no regrets
Methods used in building concrete retaining wall 300 ft down cliff and steep hillside to bottom of tower at Sea Lion Caves on coast of Oregon; concrete was placed through wooden chute 125 ft long, to point 75 ft above top of tower and from there by 5 in .diam 16-gage steel pipe; baffles prevented segregation; results reported satisfactory.
Chuting concrete 175 prime vertically with no regrets
Pac Bldr Engr
Gardner, C.A. (Autor:in)
1949
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
IET Digital Library Archive | 1996
No Regrets: Apple Computer Inc
British Library Online Contents | 1999
Les Regrets suivis des Antiquités de Rome
UB Braunschweig | 1949
|Urban regrets (Unhappy metros: Satisfaction with life scale (SWLS))
Elsevier | 2024
|