Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quebec's fifteenth welded girder bridge erected in record time
Erection of 1520-ft long, 10-span continuous girder type bridge over Milles Iles River, 25 mi from Montreal; 1300 tons of steel used; bridge consists of two 120-ft end spans and eight 160-ft intermediate spans.
Quebec's fifteenth welded girder bridge erected in record time
Erection of 1520-ft long, 10-span continuous girder type bridge over Milles Iles River, 25 mi from Montreal; 1300 tons of steel used; bridge consists of two 120-ft end spans and eight 160-ft intermediate spans.
Quebec's fifteenth welded girder bridge erected in record time
Roads Bridges
Real Gagnon, J.H. (Autor:in)
Roads and Bridges ; 87
1949
2 pages
Diagrams
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Method for replacing erected bridge through bridge girder erection machine
Europäisches Patentamt | 2023
|Challenging bridge suspension tower erected in record time
British Library Online Contents | 2011
|Bridge of radical design erected in record time
Engineering Index Backfile | 1942
Bridge of radical design erected in record time
Engineering Index Backfile | 1942
Bridge of radical design erected in record time
Engineering Index Backfile | 1942