Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge of radical design erected in record time
CNR bridge engineers develop unique two-girder design that saves 350, 000 lb of steel for war purposes; erection over Trans-Island Boulevard at Dorval, Quebec, completed in 6 hours, with train schedules uninterrupted. (See also Eng and Contract Rec v 55 n 2 Jan 14 1942 p 10-1; Can Transportation Feb 1942 p 61-4; Civil Eng (Lond) v 37 n 428 Feb 1942 p 32-4)
Bridge of radical design erected in record time
CNR bridge engineers develop unique two-girder design that saves 350, 000 lb of steel for war purposes; erection over Trans-Island Boulevard at Dorval, Quebec, completed in 6 hours, with train schedules uninterrupted. (See also Eng and Contract Rec v 55 n 2 Jan 14 1942 p 10-1; Can Transportation Feb 1942 p 61-4; Civil Eng (Lond) v 37 n 428 Feb 1942 p 32-4)
Bridge of radical design erected in record time
Ry Age
Railway Age ; 112
1942
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge of radical design erected in record time
Engineering Index Backfile | 1942
Bridge of radical design erected in record time
Engineering Index Backfile | 1942
Challenging bridge suspension tower erected in record time
British Library Online Contents | 2011
|Quebec's fifteenth welded girder bridge erected in record time
Engineering Index Backfile | 1949
|Steel frame erected in record time
Engineering Index Backfile | 1946
|