Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bailey bridge over Whiteadder water, Northumberland
Semipermanent road bridge consisting of five Bailey spans on wooden piled piers, constructed to replace permanent bridge washed away in floods of Aug 1948; building and launching of bridge took 2 1/2 working days; "broken span" design achieved by coupling only bottom chords at junctions of five spans.
Bailey bridge over Whiteadder water, Northumberland
Semipermanent road bridge consisting of five Bailey spans on wooden piled piers, constructed to replace permanent bridge washed away in floods of Aug 1948; building and launching of bridge took 2 1/2 working days; "broken span" design achieved by coupling only bottom chords at junctions of five spans.
Bailey bridge over Whiteadder water, Northumberland
Engineering
Engineering ; 167
1949
2 pages
Photographs
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Confederation Bridge Over the Northumberland Strait
Springer Verlag | 2002
|Engineering Index Backfile | 1944
|Engineering Index Backfile | 1944
|The Northumberland Strait Bridge Project
British Library Conference Proceedings | 1995
|Northumberland strait crossing bridge connection
British Library Conference Proceedings | 1998
|