Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge renewal at Stamford brook, London transport
80-yr old structure carried two tracks of 4-track District and Piccadilly lines across coal sidings of London Midland Region; spans being replaced are of wrought iron; new bridge has been lifted in four separate spans, two for each track; spans are being decked with reinforced concrete, waterproofed and covered with blue brindle tiles to carry ballasted track; hand railings are incorporated instead of parapet girders.
Bridge renewal at Stamford brook, London transport
80-yr old structure carried two tracks of 4-track District and Piccadilly lines across coal sidings of London Midland Region; spans being replaced are of wrought iron; new bridge has been lifted in four separate spans, two for each track; spans are being decked with reinforced concrete, waterproofed and covered with blue brindle tiles to carry ballasted track; hand railings are incorporated instead of parapet girders.
Bridge renewal at Stamford brook, London transport
Ry Gaz
Railway Gazette ; 91
1949
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
18-027 Developing energy performance standards for UK housing: The Stamford Brook project
British Library Conference Proceedings | 2005
|Dingle Brook Bridge wins CONSTRUCT award
British Library Online Contents | 1999
Construction Driven Design - Bennett Brook Bridge
British Library Conference Proceedings | 1997
|Stamford Reinvents Its Downtown
British Library Online Contents | 1997
|Stamford Township sewer system
Engineering Index Backfile | 1928