Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Instead of $12,000 steel bridge, Daviess County, Ind, erected center pier and used two 23-ft multiplate arches each with 8-ft rise thus providing sufficient waterway; total cost $4300.
Instead of $12,000 steel bridge, Daviess County, Ind, erected center pier and used two 23-ft multiplate arches each with 8-ft rise thus providing sufficient waterway; total cost $4300.
Double arch waterway replaces bridge
Pub Works
Myers, A.L. (Autor:in)
Public Works ; 79
1948
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Through concrete arch bridge to give large waterway
Engineering Index Backfile | 1919
|Concrete arch replaces viaduct at Portland, Ore.
Engineering Index Backfile | 1926
Bridge replaces buried crossing
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1935
|Replaces bridge across Sandusky bay
Engineering Index Backfile | 1946