Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Severe scouring action caused by seasonal floods has forced pipe line company to replace its buried crossing of meandering Sutlej River in Pakistan; in order to meet changing conditions, bridge more than mile in length has been built across river; 3 main chords of bridge are 3 12-in. lines carrying gas; 23 piers are at 252-ft centers and consist of 5-ft diam steel-cased reinforced concrete piles.
Severe scouring action caused by seasonal floods has forced pipe line company to replace its buried crossing of meandering Sutlej River in Pakistan; in order to meet changing conditions, bridge more than mile in length has been built across river; 3 main chords of bridge are 3 12-in. lines carrying gas; 23 piers are at 252-ft centers and consist of 5-ft diam steel-cased reinforced concrete piles.
Bridge replaces buried crossing
Oil Gas J
McNeile, D.H. (Autor:in)
Oil and Gas Journal ; 62
1964
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge of unusual design replaces Ohio river crossing of big four at Louisville
Engineering Index Backfile | 1929
|Double arch waterway replaces bridge
Engineering Index Backfile | 1948
|Replaces bridge across Sandusky bay
Engineering Index Backfile | 1946
Lone Star Pipeline Replaces 1,400-foot River Crossing
Online Contents | 1998
Piping bridge replaces underground system
Engineering Index Backfile | 1956
|