Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Teamwork, trucks and timing payoff at Chicago municipal airport
Data on resurfacing airport with hot mix; organization made possible laying of 2500 to 3500 tons per day in midst of 400 daily flights; asphaltic concrete contained 55% limestone, 33% sand, 5% limestone dust and 6% asphaltic cement having 100-120 penetration; it was laid at 275 F; illustrations show work stages and equipment.
Teamwork, trucks and timing payoff at Chicago municipal airport
Data on resurfacing airport with hot mix; organization made possible laying of 2500 to 3500 tons per day in midst of 400 daily flights; asphaltic concrete contained 55% limestone, 33% sand, 5% limestone dust and 6% asphaltic cement having 100-120 penetration; it was laid at 275 F; illustrations show work stages and equipment.
Teamwork, trucks and timing payoff at Chicago municipal airport
Roads Streets
Maxwell, H.M. (Autor:in)
Roads and Streets ; 91
1948
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Chicago municipal airport fire
Engineering Index Backfile | 1930
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Jacksonville municipal airport
Engineering Index Backfile | 1929
Engineering Index Backfile | 1936
|