A platform for research: civil engineering, architecture and urbanism
Teamwork, trucks and timing payoff at Chicago municipal airport
Data on resurfacing airport with hot mix; organization made possible laying of 2500 to 3500 tons per day in midst of 400 daily flights; asphaltic concrete contained 55% limestone, 33% sand, 5% limestone dust and 6% asphaltic cement having 100-120 penetration; it was laid at 275 F; illustrations show work stages and equipment.
Teamwork, trucks and timing payoff at Chicago municipal airport
Data on resurfacing airport with hot mix; organization made possible laying of 2500 to 3500 tons per day in midst of 400 daily flights; asphaltic concrete contained 55% limestone, 33% sand, 5% limestone dust and 6% asphaltic cement having 100-120 penetration; it was laid at 275 F; illustrations show work stages and equipment.
Teamwork, trucks and timing payoff at Chicago municipal airport
Roads Streets
Maxwell, H.M. (author)
Roads and Streets ; 91
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chicago municipal airport fire
Engineering Index Backfile | 1930
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1929