Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Grouting problems in driving leadville tunnel
At several points, large underground reservoirs of water were tapped; it was frequently necessary to consolidate unstable rocks ahead of face by grouting, before advancing tunnel; ordinary grouting procedures found inapplicable; development of technique involving sealing tunnel face and lining walls with concrete; also use of oats as expanding medium, mixed with grout and introduced at low pressures into short holes in tunnel lining.
Grouting problems in driving leadville tunnel
At several points, large underground reservoirs of water were tapped; it was frequently necessary to consolidate unstable rocks ahead of face by grouting, before advancing tunnel; ordinary grouting procedures found inapplicable; development of technique involving sealing tunnel face and lining walls with concrete; also use of oats as expanding medium, mixed with grout and introduced at low pressures into short holes in tunnel lining.
Grouting problems in driving leadville tunnel
Mines Mag
Volin, M.E. (Autor:in)
Mines Magazine ; 38
1948
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1951
How Leadville tunnel is driven through bad ground
Engineering Index Backfile | 1945
|British Library Conference Proceedings | 2006
|