Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Excavation of trench for 20 v 30-ft concrete conduit for Southern California Edison Co on Terminal Island, Calif necessitated dewatering and excavation in 2 stages; well-point installation permitted dry excavation to 28 ft below ground water level.
Excavation of trench for 20 v 30-ft concrete conduit for Southern California Edison Co on Terminal Island, Calif necessitated dewatering and excavation in 2 stages; well-point installation permitted dry excavation to 28 ft below ground water level.
Wellpoints dewater below sea level
Western Construction News
Salley, A.J. (Autor:in)
1948
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
Engineering Index Backfile | 1930
Engineering Index Backfile | 1943
|Wellpoints dewater Denison Dam closure area
Engineering Index Backfile | 1946
|Six deep wells dewater excavation
Engineering Index Backfile | 1959