A platform for research: civil engineering, architecture and urbanism
Excavation of trench for 20 v 30-ft concrete conduit for Southern California Edison Co on Terminal Island, Calif necessitated dewatering and excavation in 2 stages; well-point installation permitted dry excavation to 28 ft below ground water level.
Excavation of trench for 20 v 30-ft concrete conduit for Southern California Edison Co on Terminal Island, Calif necessitated dewatering and excavation in 2 stages; well-point installation permitted dry excavation to 28 ft below ground water level.
Wellpoints dewater below sea level
Western Construction News
Salley, A.J. (author)
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1930
Wellpoints dewater Denison Dam closure area
Engineering Index Backfile | 1946
|Six deep wells dewater excavation
Engineering Index Backfile | 1959