Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway fill pumped into place
Pictorial report on construction of embankment of Columbia River Highway by means of dredging; direction of flow of material through three dredge pipes can be quickly changed by large diam valve; as dredged material enters fill, it is terraced by bulldozer.
Highway fill pumped into place
Pictorial report on construction of embankment of Columbia River Highway by means of dredging; direction of flow of material through three dredge pipes can be quickly changed by large diam valve; as dredged material enters fill, it is terraced by bulldozer.
Highway fill pumped into place
Construction Methods
Construction Methods ; 30
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
Failure of Highway Fill and Investigation into its Causes
British Library Conference Proceedings | 1993
|Pre-wetting highway fill material
Engineering Index Backfile | 1960
Muck dredged out, solid fill pumped
Engineering Index Backfile | 1941
|Anchored timber bulkhead supports highway fill
Engineering Index Backfile | 1939