Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pre-wetting highway fill material
Application of pre-wetting of embankment by controlled pre-irrigation in State of Wyoming; State specifications for pre-irrigation; use of highly portable large diameter articulated pipe lines with quick couplings; spacing between lines is mostly 60 ft and sprinklers are at 20 ft intervals; selection of pumping pressure, nozzle type, and rate of application of water; 95 to 100% compaction is achieved.
Pre-wetting highway fill material
Application of pre-wetting of embankment by controlled pre-irrigation in State of Wyoming; State specifications for pre-irrigation; use of highly portable large diameter articulated pipe lines with quick couplings; spacing between lines is mostly 60 ft and sprinklers are at 20 ft intervals; selection of pumping pressure, nozzle type, and rate of application of water; 95 to 100% compaction is achieved.
Pre-wetting highway fill material
Western Construction
Western Construction ; 35
1960
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fly ash as fill material for highway embankments
British Library Conference Proceedings | 1995
|Engineering Index Backfile | 1957
Highway fill pumped into place
Engineering Index Backfile | 1948
Flowable Fill as Geotechnical Material in Highway Cross-Drain Trenches
Online Contents | 2007
|Flowable Fill as Geotechnical Material in Highway Cross-Drain Trenches
British Library Online Contents | 2007
|