Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge piles driven by precision method
Manufacture and driving 21,000 lin ft of precast piling for 2756 ft slab and girder portion of highway bridge in Georgia; piles were cast on site, in 18-in. octagonal cross section, from 43 to 62 ft long; piles were driven by crawler crane equipped with 72-ft boom and handling leads 60 ft long; accurate spotting of piles was assured by use of specially designed timber template.
Bridge piles driven by precision method
Manufacture and driving 21,000 lin ft of precast piling for 2756 ft slab and girder portion of highway bridge in Georgia; piles were cast on site, in 18-in. octagonal cross section, from 43 to 62 ft long; piles were driven by crawler crane equipped with 72-ft boom and handling leads 60 ft long; accurate spotting of piles was assured by use of specially designed timber template.
Bridge piles driven by precision method
Eng News-Rec
Engineering News-Record ; 141
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
CONSTRUCTION METHOD OF BRIDGE USING OVERLAPPED PILES AND BRIDGE USING OVERLSPPED PILES
Europäisches Patentamt | 2022
|Garrison Dam bridge piles driven with all-position leads
Engineering Index Backfile | 1947
50-ft. Concrete bridge piles driven six days after pouring
Engineering Index Backfile | 1928
|Composite piles driven to support bridge approaches for Portland throughway
Engineering Index Backfile | 1949
Engineering Index Backfile | 1968
|