Pierhead foundation repair in Cleveland
Pierhead at Cleveland, Ohio, was constructed by sinking timber crib 60 ft wide, 100 ft long and 22 ft deep, to 3 ft below mean lake level and filling it with rubble stone; due to openings in crib, stones were displaced from it; repair was achieved by pumpcreting under water; illustrated description of procedure.
Pierhead foundation repair in Cleveland
Pierhead at Cleveland, Ohio, was constructed by sinking timber crib 60 ft wide, 100 ft long and 22 ft deep, to 3 ft below mean lake level and filling it with rubble stone; due to openings in crib, stones were displaced from it; repair was achieved by pumpcreting under water; illustrated description of procedure.
Rebuilding Cleveland: The Cleveland Foundation and its Evolving Urban Strategy
Online Contents | 1994
|The foundation of the Union National Bank building, Cleveland, Ohio
Engineering Index Backfile | 1916