A platform for research: civil engineering, architecture and urbanism
Pierhead foundation repair in Cleveland
Pierhead at Cleveland, Ohio, was constructed by sinking timber crib 60 ft wide, 100 ft long and 22 ft deep, to 3 ft below mean lake level and filling it with rubble stone; due to openings in crib, stones were displaced from it; repair was achieved by pumpcreting under water; illustrated description of procedure.
Pierhead foundation repair in Cleveland
Pierhead at Cleveland, Ohio, was constructed by sinking timber crib 60 ft wide, 100 ft long and 22 ft deep, to 3 ft below mean lake level and filling it with rubble stone; due to openings in crib, stones were displaced from it; repair was achieved by pumpcreting under water; illustrated description of procedure.
Rebuilding Cleveland: The Cleveland Foundation and its Evolving Urban Strategy
Online Contents | 1994
|The foundation of the Union National Bank building, Cleveland, Ohio
Engineering Index Backfile | 1916
|British Library Online Contents | 2012
|Online Contents | 2012
|Online Contents | 1995
|