Permanently frozen ground governed construction methods at Hess Creek Dam in Alaska; sprinkling was found preferable to hydraulic jet sluicing in removing frozen overburden; refrigeration system was installed for purpose of speeding refreezing of foundations in exposed areas; dam is 83 ft high and has length of 1675 ft; full reservoir will inundate some 380 acres and contain 7700 acre-ft.
Earth-fill dam built on frozen ground
Permanently frozen ground governed construction methods at Hess Creek Dam in Alaska; sprinkling was found preferable to hydraulic jet sluicing in removing frozen overburden; refrigeration system was installed for purpose of speeding refreezing of foundations in exposed areas; dam is 83 ft high and has length of 1675 ft; full reservoir will inundate some 380 acres and contain 7700 acre-ft.
Earth-fill dam built on frozen ground
Eng News-Rec
Engineering News-Record ; 140
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Earth fill dam built by CCC in Kansas
Engineering Index Backfile | 1934
|Sill pillar mining beneath frozen fill
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1954
|Palisades will be biggest earth fill dam built by bureau of reclamation
Engineering Index Backfile | 1947
Water Balance of an Earth Fill Built of Slightly Contaminated Organic Clay
British Library Conference Proceedings | 2012
|