Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design of earth-fill structure with semi-hydraulic filled core; top width 40 ft, to provide roadway; upstream slope 3 horizontal to 1 vertical; erosion checked by banquette.
Design of earth-fill structure with semi-hydraulic filled core; top width 40 ft, to provide roadway; upstream slope 3 horizontal to 1 vertical; erosion checked by banquette.
Earth fill dam built by CCC in Kansas
Pub Works
Wilson, M.A. (Autor:in)
Public Works ; 65
1934
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Earth-fill dam built on frozen ground
Engineering Index Backfile | 1948
How Kansas built concrete test pavement
Engineering Index Backfile | 1951
Engineering Index Backfile | 1954
|Palisades will be biggest earth fill dam built by bureau of reclamation
Engineering Index Backfile | 1947