Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Grouted gravel fill and precast slabs provide new face for Barker dam
Rehabilitation of disintegrated upstream face of 38-yr old, 175-ft high concrete structure in Boulder County, Colo, involved use of precast concrete slabs as forms in constructing protective blanket of concrete varying in thickness from about 3 ft at crest to about 8 ft at base; data on foundation grouting and drainage, prepakt concrete and precast slabs; conclusions gained from experience. (See also - (discussion) v 20 n 4 pt 2 Dec p 668 (7 p); Civ Eng (NY) v 18 n 2 Feb 1948 p 26-31, 84)
Grouted gravel fill and precast slabs provide new face for Barker dam
Rehabilitation of disintegrated upstream face of 38-yr old, 175-ft high concrete structure in Boulder County, Colo, involved use of precast concrete slabs as forms in constructing protective blanket of concrete varying in thickness from about 3 ft at crest to about 8 ft at base; data on foundation grouting and drainage, prepakt concrete and precast slabs; conclusions gained from experience. (See also - (discussion) v 20 n 4 pt 2 Dec p 668 (7 p); Civ Eng (NY) v 18 n 2 Feb 1948 p 26-31, 84)
Grouted gravel fill and precast slabs provide new face for Barker dam
Am Concrete Inst -- J
Davis, R.E. (Autor:in) / Jansen, E.C. (Autor:in) / Neelands, W.T. (Autor:in)
1948
35 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Grouted gravel fill and precast slabs provide new face for Barker dam
Engineering Index Backfile | 1948
|Grouted fill protects breakwater
Engineering Index Backfile | 1948
|Precast concrete slabs face bridge abutments
Engineering Index Backfile | 1940
|Face forms unnecessary with precast concrete slabs
Engineering Index Backfile | 1940
Upstream face of dam refaced with precast slabs
Engineering Index Backfile | 1947
|