Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Report on welding and other operations employed in repair of upstream face of Colorado's Barker dam; concrete slabs were skin grafted to dam face by lap welding steel dowels embedded in slabs to steel anchor bars grouted into face; concreting and grouting practices; space between face of dam and slab wall was filled with "Prepakt " concrete.
Report on welding and other operations employed in repair of upstream face of Colorado's Barker dam; concrete slabs were skin grafted to dam face by lap welding steel dowels embedded in slabs to steel anchor bars grouted into face; concreting and grouting practices; space between face of dam and slab wall was filled with "Prepakt " concrete.
Dam gets face lifting
Welding Engr
Young, H.W. (Autor:in)
Welding Engineer ; 33
1948
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Milwaukee's 73-year old water tower gets face lifting
Engineering Index Backfile | 1946
|Online Contents | 2010
British Library Online Contents | 2010
Engineering Index Backfile | 1964
|DETROIT-WINDSOR TUNNEL GETS A FACE-LIFT
Online Contents | 1994