Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete pumped to high sliding forms
More than 5000 yd of concrete went into slip forms for 12,500-ton blending bin and 6000-ton raw coal bin; slip form section was 72 1/2 ft high; about 3000 yd of concrete was pumped 60 ft horizontally and 80 ft vertically to working deck; here concrete was buggied to forms; these were raised 1 in. on each jacking operation at about 10 min intervals to permit pour rate of 6 in. per hr.
Concrete pumped to high sliding forms
More than 5000 yd of concrete went into slip forms for 12,500-ton blending bin and 6000-ton raw coal bin; slip form section was 72 1/2 ft high; about 3000 yd of concrete was pumped 60 ft horizontally and 80 ft vertically to working deck; here concrete was buggied to forms; these were raised 1 in. on each jacking operation at about 10 min intervals to permit pour rate of 6 in. per hr.
Concrete pumped to high sliding forms
Construction Methods
Construction Methods ; 30
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge deck paved with pumped concrete on plywood forms
Engineering Index Backfile | 1943
Pumped concrete forms 20 acres of floors for army warehouse
Engineering Index Backfile | 1942
|Method of constructing concrete walls with sliding forms
Engineering Index Backfile | 1911
Engineering Index Backfile | 1947
New types of sliding forms in concrete building construction
Engineering Index Backfile | 1955
|