Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Arch bridge construction beats rainy season
Canimar River bridge, Cuba, is parabolic arch of 973 ft overall length, and three spans at 218 ft; deck consists of 42 1/2 ft roadway and two 5-ft sidewalks; forms for arches supported by timber falsework resting on piles; cableways, one on each arch rib centerline, were vital tools for materials handling; removal of falsework; concrete plant.
Arch bridge construction beats rainy season
Canimar River bridge, Cuba, is parabolic arch of 973 ft overall length, and three spans at 218 ft; deck consists of 42 1/2 ft roadway and two 5-ft sidewalks; forms for arches supported by timber falsework resting on piles; cableways, one on each arch rib centerline, were vital tools for materials handling; removal of falsework; concrete plant.
Arch bridge construction beats rainy season
Eng News-Rec
1952
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Earthwork construction method suitable for rainy season
Europäisches Patentamt | 2022
|Rainy season roadbed earthwork construction structure and construction method thereof
Europäisches Patentamt | 2020
|Community spirit and the rainy season
Online Contents | 2003
|