Earthwork construction method suitable for rainy season
The invention belongs to the technical field of engineering construction, and relates to an earthwork construction method suitable for a rainy season, which is characterized by comprising the following steps: S1, analyzing a construction plan in the rainy season, planning a construction scheme and preparing related materials; s2, paying off and positioning before construction, and determining the boundary range of the roadbed; s3, a drainage ditch is dug, and a soil retaining weir is stacked; s4, digging a settling well, communicating the settling well with a municipal drainage pipeline, and installing a drainage mechanism; and S5, a foundation pit is dug, concrete is poured, and the foundation pit is filled. Through the design of the foundation, the sedimentation pipeline and the rotating wheel, when the sedimentation pipeline is full of water, the spiral fan blades can rotate to drive the rotating shaft to rotate, and the rotating shaft drives the rotating wheel to rotate, so that the bristles can scrape and clean the peripheral outer side of the rotating wheel, and the fan blade cavity can be prevented from being blocked by foreign matters; and meanwhile, the spiral fan blades are driven by water flow, so that energy conservation and environmental protection are achieved.
本发明属于工程施工技术领域,一种适用于雨季的土方工程施工方法,其特征在于,包括以下步骤:S1.分析雨季施工计划,规划施工方案,准备相关材料;S2.施工前放线定位,定出路基的地界范围;S3.挖设排水沟,堆设挡土堰;S4.挖设沉降井,沉降井与市政排水管道接通,安装排水机构;S5.挖设基坑,浇筑混凝土,填筑基坑。本发明通过包括地基、沉降管道、及转轮的设计,当沉降管道内的水蓄满时,可以通过螺旋扇叶转动带动转动轴转动,转动轴带动转轮转动,从而使刷毛能够对转轮的周外侧进行刮擦清洁,这样就可以避免扇叶腔被异物堵塞,提高雨季施工的排水效率,同时,螺旋扇叶由水流驱动,节能环保。
Earthwork construction method suitable for rainy season
The invention belongs to the technical field of engineering construction, and relates to an earthwork construction method suitable for a rainy season, which is characterized by comprising the following steps: S1, analyzing a construction plan in the rainy season, planning a construction scheme and preparing related materials; s2, paying off and positioning before construction, and determining the boundary range of the roadbed; s3, a drainage ditch is dug, and a soil retaining weir is stacked; s4, digging a settling well, communicating the settling well with a municipal drainage pipeline, and installing a drainage mechanism; and S5, a foundation pit is dug, concrete is poured, and the foundation pit is filled. Through the design of the foundation, the sedimentation pipeline and the rotating wheel, when the sedimentation pipeline is full of water, the spiral fan blades can rotate to drive the rotating shaft to rotate, and the rotating shaft drives the rotating wheel to rotate, so that the bristles can scrape and clean the peripheral outer side of the rotating wheel, and the fan blade cavity can be prevented from being blocked by foreign matters; and meanwhile, the spiral fan blades are driven by water flow, so that energy conservation and environmental protection are achieved.
本发明属于工程施工技术领域,一种适用于雨季的土方工程施工方法,其特征在于,包括以下步骤:S1.分析雨季施工计划,规划施工方案,准备相关材料;S2.施工前放线定位,定出路基的地界范围;S3.挖设排水沟,堆设挡土堰;S4.挖设沉降井,沉降井与市政排水管道接通,安装排水机构;S5.挖设基坑,浇筑混凝土,填筑基坑。本发明通过包括地基、沉降管道、及转轮的设计,当沉降管道内的水蓄满时,可以通过螺旋扇叶转动带动转动轴转动,转动轴带动转轮转动,从而使刷毛能够对转轮的周外侧进行刮擦清洁,这样就可以避免扇叶腔被异物堵塞,提高雨季施工的排水效率,同时,螺旋扇叶由水流驱动,节能环保。
Earthwork construction method suitable for rainy season
一种适用于雨季的土方工程施工方法
ZHANG PENGFEI (Autor:in) / JU YUNFENG (Autor:in) / ZENG WENQIANG (Autor:in) / XU FEIJING (Autor:in) / LI LINGFENG (Autor:in)
14.10.2022
Patent
Elektronische Ressource
Chinesisch
Rainy season roadbed earthwork construction structure and construction method thereof
Europäisches Patentamt | 2020
|Arch bridge construction beats rainy season
Engineering Index Backfile | 1952
Construction method for shortening construction period of roof engineering in rainy season
Europäisches Patentamt | 2022
|