Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Aussois-Plan d'Amont upstream level dam
At elevation 130 m higher than existing downstream level reservoir and dam, new 350-m long buttressed gravity dam was erected for better utilization of water head; it has straight and slightly arched section; calculations indicated steep upstream face for dam, securing 14% saving on concrete; spillway discharge through face of buttresses.
Aussois-Plan d'Amont upstream level dam
At elevation 130 m higher than existing downstream level reservoir and dam, new 350-m long buttressed gravity dam was erected for better utilization of water head; it has straight and slightly arched section; calculations indicated steep upstream face for dam, securing 14% saving on concrete; spillway discharge through face of buttresses.
Aussois-Plan d'Amont upstream level dam
Le barrage d'Aussois-Plan d'Amont
Orth, J. (Autor:in) / Belmont, M. (Autor:in)
1958
18 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydroelectric utilization of head at Aussois, Savoy, France
Engineering Index Backfile | 1951
Colloque Franco-Sovieti͏̈que Points Conjugues, Aussois 1973
TIBKAT | 1973
|Engineering Index Backfile | 1955
|Flap Gate Design for Automatic Upstream Canal Water Level Control
British Library Online Contents | 2001
|Tide Level Response to Upstream Discharge Variation in Yangtze Estuary
British Library Conference Proceedings | 2013
|