Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Earthfill dam 800 ft long, 200 ft wide at toe, and containing 230,000 cu yd earth and rock, is being built in wet, without benefit of cofferdams; impervious fill was used for core of dam; semipervious material was placed on top of impervious fill, and 1 ft sand and gravel blanket was placed on side slopes and further protected by 2 ft of rock riprap; reinforced concrete spillway is supported on timber piles; work stages illustrated.
Earthfill dam 800 ft long, 200 ft wide at toe, and containing 230,000 cu yd earth and rock, is being built in wet, without benefit of cofferdams; impervious fill was used for core of dam; semipervious material was placed on top of impervious fill, and 1 ft sand and gravel blanket was placed on side slopes and further protected by 2 ft of rock riprap; reinforced concrete spillway is supported on timber piles; work stages illustrated.
Des Chutes Basin dam
Pacific Bldr Engr
Carey, J.W. (Autor:in)
1950
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Stilling the Waters: Stilling Basin Design for Stepped Chutes
British Library Conference Proceedings | 2015
|Online Contents | 2011
Springer Verlag | 1986
|Online Contents | 1986
|