Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Part of property recently acquired by East Bay Municipal Utilities District, Calif.; dam is 185 ft. maximum height and 656 ft. long at crest; supply tunnel; filter plant.
Part of property recently acquired by East Bay Municipal Utilities District, Calif.; dam is 185 ft. maximum height and 656 ft. long at crest; supply tunnel; filter plant.
Upper San Leandro water project
Pub. Works
Geiger, C.W. (Autor:in)
Public Works ; 59
1928
3 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The upper San Leandro project of the east bay water company, Oakland, California
Engineering Index Backfile | 1926
San Leandro Freedom of Choice in Housing Project
NTIS | 1974
art - Installations - Leandro Erlich
Online Contents | 2007
Leandro Valencia Locsin : filipino architect
UB Braunschweig | 2022
|The 80-ft. Concrete-arch bridge over the San Leandro Creek, San Leandro, Cal.
Engineering Index Backfile | 1903
|