Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The upper San Leandro project of the east bay water company, Oakland, California
Project is one of three major surface-water supplies of company, and includes construction of large hydraulic-fill dam across San Leandro creek above Lake Chabot developments; concrete-lined tunnel through hills 7150 ft. long, and rapid-sand filtration plant at head of distribution system in East Oakland.
The upper San Leandro project of the east bay water company, Oakland, California
Project is one of three major surface-water supplies of company, and includes construction of large hydraulic-fill dam across San Leandro creek above Lake Chabot developments; concrete-lined tunnel through hills 7150 ft. long, and rapid-sand filtration plant at head of distribution system in East Oakland.
The upper San Leandro project of the east bay water company, Oakland, California
West. Constr. News
1926
5 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Upper San Leandro water project
Engineering Index Backfile | 1928
|The San Leandro earth dam of the Oakland water works
Engineering Index Backfile | 1902
|San Leandro Freedom of Choice in Housing Project
NTIS | 1974
Primary Care Clinic, Oakland Children's Hospital, Oakland, California
British Library Online Contents | 1994