Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building subaqueous tunnel to accommodate pedestrian, vehicular and street-car traffic of reinforced-concrete sections in drydock, then floating them 10 miles across bay, to be sunk and connected together in previously prepared trench 90 ft. below surface of water; design and methods used in constructing 12 precast concrete segments in drydock at Hunter Point; in order to make segments buoyant it was necessary to securely bulkhead and waterproof both ends of each cylinder.
Building subaqueous tunnel to accommodate pedestrian, vehicular and street-car traffic of reinforced-concrete sections in drydock, then floating them 10 miles across bay, to be sunk and connected together in previously prepared trench 90 ft. below surface of water; design and methods used in constructing 12 precast concrete segments in drydock at Hunter Point; in order to make segments buoyant it was necessary to securely bulkhead and waterproof both ends of each cylinder.
Alameda estuary tube
West. Constr. News
King, L.M. (Autor:in)
1928
8 pages
15 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1926
|The Oakland-Alameda estuary tube
Engineering Index Backfile | 1930
|Concrete on the Oakland-Alameda estuary tube
Engineering Index Backfile | 1927
|Oakland-Alameda estuary subway
Engineering Index Backfile | 1926
|