Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large-section tunnel construction at Asheville
Section 48 × 27 ft. opened by widening center heading and taking out bench in two lifts, using power shovels and cars; rock tunnel of unusually large section, 920 ft. long; construction methods and plant; estimated that average of 7000 vehicles daily will pass through this tunnel.
Large-section tunnel construction at Asheville
Section 48 × 27 ft. opened by widening center heading and taking out bench in two lifts, using power shovels and cars; rock tunnel of unusually large section, 920 ft. long; construction methods and plant; estimated that average of 7000 vehicles daily will pass through this tunnel.
Large-section tunnel construction at Asheville
Eng. News-Rec
Hageman, E.L. (Autor:in)
Engineering News Record ; 100
1928
3 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
AEG2019 Asheville, NC - program with abstracts
TIBKAT | 2019
|Repairing a failed concrete arch at Asheville
Engineering Index Backfile | 1925
|Patched streets are smooth streets in Asheville, N.C
Engineering Index Backfile | 1930
The Homegrown Downtown: Redevelopment in Asheville, North Carolina
Online Contents | 2017
|Large-section mining method tunnel construction method
Europäisches Patentamt | 2023
|