Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Repairing a failed concrete arch at Asheville
End arch of bridge of six 75-ft. spans sheared at spring line; restored by tangential jacking after blocking up.
Repairing a failed concrete arch at Asheville
End arch of bridge of six 75-ft. spans sheared at spring line; restored by tangential jacking after blocking up.
Repairing a failed concrete arch at Asheville
Eng. News-Rec
Hutchings, Jr., J.B. (Autor:in)
1925
2 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Repairing concrete arch viaduct
Engineering Index Backfile | 1940
|Repairing concrete arch viaduct
Engineering Index Backfile | 1940
|AEG2019 Asheville, NC - program with abstracts
TIBKAT | 2019
|Reinforced concrete bridge of the Southern Ry. Co. at Asheville,
Engineering Index Backfile | 1911
|Large-section tunnel construction at Asheville
Engineering Index Backfile | 1928
|