Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel-construction and main-line deviation on the Central railway of Peru
Account of construction methods on highest standard-gage railway in world; location; tunnel; ventilation.
Tunnel-construction and main-line deviation on the Central railway of Peru
Account of construction methods on highest standard-gage railway in world; location; tunnel; ventilation.
Tunnel-construction and main-line deviation on the Central railway of Peru
Instn. Civil Engrs. -- Sessional Notices
Hixson, F.F. (Autor:in)
1928
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel construction and main line deviation on the Central Railway of Peru
Engineering Index Backfile | 1928
|Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|Main line widening near Maldonado Junction, Central Argentine Railway
Engineering Index Backfile | 1935