Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building a pumping station under difficulties
Construction methods used on new pumping station in Chicago, under construction by city forces, show how difficult job can be handled under conditions that require maximum speed; this station has been designed for operation by purchased electric power; pump-room excavation; shaft of concrete.
Building a pumping station under difficulties
Construction methods used on new pumping station in Chicago, under construction by city forces, show how difficult job can be handled under conditions that require maximum speed; this station has been designed for operation by purchased electric power; pump-room excavation; shaft of concrete.
Building a pumping station under difficulties
Eng. Contracting
1928
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficulties in Building the Louisville Pumping Station
Wiley | 1920
|Sewerage Pumping Station Optimization Under Real Conditions
Tema Archiv | 2014
|Building Liard River bridge piers under unusual difficulties
Engineering Index Backfile | 1945
|Putting up a concrete building under severe difficulties
Engineering Index Backfile | 1921
|Difficulties of tunnel building
Engineering Index Backfile | 1892
|