Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Putting up a concrete building under severe difficulties
Fish-freezing plant on island of St. Pierre erected on rocky site. Materials and labor imported. Fire of extreme severity destroyed concrete and necessitated partial rebuilding.
Putting up a concrete building under severe difficulties
Fish-freezing plant on island of St. Pierre erected on rocky site. Materials and labor imported. Fire of extreme severity destroyed concrete and necessitated partial rebuilding.
Putting up a concrete building under severe difficulties
Contract Rec
Paddock, H.C. (Autor:in)
Contract Record ; 35
1921
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Building a pumping station under difficulties
Engineering Index Backfile | 1928
Concrete arch bridge built under difficulties
Engineering Index Backfile | 1928
Difficulties in building reinforced-concrete aqueduct 17 feet in diameter
Engineering Index Backfile | 1914
|Concrete lined aqueduct tunnel driven under unusual difficulties
Engineering Index Backfile | 1912
Building Liard River bridge piers under unusual difficulties
Engineering Index Backfile | 1945
|